Richard Evans
Director
Works are really moving at a pace on site, aided by this very dry spell. Some of the fenestration details are starting to take shape. All materials, head, sill and corbel details have been carefully designed to match the details of existing Chirbury village centre buildings.
Drone View 02
Plot 01 – 03 Front Elevation
Plot 01 – 03 Rear Elevation
Plot 02 Rumbled Limestone and arched brick rowlock header to French door
Plot 02 Rumbled Limestone and arched brick rowlock header and sill detail
Plot 04 & 05 Front Elevation showing dormers
Plot 03 Stone Door Surround Detail